PENSTOCKS AND LARGE BORE MATERIAL

Job Location

Nalcor Bay d’Espoir Hydro Generating Facility Penstock #2

JOB SCOPE

The General Contractor was to locate deficiencies in the existing penstock welds, gouge out the cracks and re-weld the seams.

LIBURDI-GAPCO’S SCOPE

Trained and tested eight Local 203 Boilermaker Welders to the Liburdi equipment, provided welding technical support throughout the project, and preformed the automated Plasma gouging of the cracks, as well as welding when required.

HOW LIBURDI-GAPCO IMPROVED THE PROJECT

Liburdi's automated plasma arc-gouging procedure allowed for faster execution of the gouging as well as a uniform width and depth of the gouge. Once complete, and with a quick transition, Liburdi’s K-Heads were then used to re-weld the seams, again reducing weld times and number of welders required.

OVERALL SUCCESS

Six linear kilometers of welding was completed ahead of schedule with a 0% repair rate for the entire welding crew including those trained by Liburdi.