Bruce Power NGS CRD-Unit
To design, fabricate and test the equipment required to repair multiple welds on four of the Calandria Relief Ducts (CRDs). To build applicable mockups, train and test the execution crew and perform the execution of the work while on site.
Liburdi was awarded the entire scope of the project from design and execution contractor, to post job wrap-up.
By using Liburdi, the Owner/Client was able to resource a single contractor as a vertically integrated team to perform the engineering, design, manufacturing, testing, qualification and execution of this prototype project.
While the scope of work changed throughout the project, Liburdi successfully executed the shipment, installed the equipment and executed the allowable scope of work. Liburdi managed to exceed expectations in this first of its kind project that was critical to the future operation of the facility.